You are here
Armorworks Enterprises, Inc.
https://www.forceengineering.com
UEI: L47CB2LW3JC8
# of Employees: 6
HUBZone Owned: No
Socially and Economically Disadvantaged: No
Woman Owned: Yes
Award Charts
Award Listing
-
Improved Environmental Protection Garment (IEPG) Fabric
Amount: $749,245.00SBIR Phase II proposal to develop active dust mitigation spacesuit fabrics that provide micrometeroid protection at 25% weight savings using engineered materials.nbsp; Current Extra-vehicular Mobility ...
SBIRPhase II2022National Aeronautics and Space Administration -
Variable Response Tire Insert
Amount: $249,835.05Redacted
SBIRPhase I2022Department of Defense Army -
DEW Protective Applique
Amount: $199,762.00SBIR Phase I proposal to demonstrate the feasibility of creating a field installable Directed Energy Weapon (DEW) protective applique using automotive film wrap materials that are modified with retror ...
SBIRPhase I2022Department of Defense Army -
Improved Environmental Protection Garment (IEPG) Fabric
Amount: $124,922.00The Extra-vehicular Mobility Unit (EMU) suits for exploration of lunar and Martian surfaces cannot resist to cut/puncture due to current outer layer materials and design. Dust mitigation is also an im ...
SBIRPhase I2021National Aeronautics and Space Administration -
High Shock Energy Reducing Pad System
Amount: $259,364.19Redacted
SBIRPhase I2021Department of Defense Army -
Composite Run Flat Insert
Amount: $1,488,559.00SBIR Phase I I proposal to develop a light-weight composite run flat insert using materials and designs that yeilded >60% weight savings in SBIR Phase I. Base effort is a Model Based Systems Enginee ...
SBIRPhase II2021Department of Defense Navy -
Lightweight Run-flat Tire/Wheel Assemblies for Marine Corps Wheeled Vehicles
Amount: $239,210.00SBIR Phase I proposal for composite run flat tire insert that incorporates load carrying capability, vibration damping, and mine blast energy attenuation. Structural fiber reinforced composites provid ...
SBIRPhase I2020Department of Defense Navy -
Torque Sensing Fastener
Amount: $139,837.00SBIR Phase I proposal to demonstrate non-contact,non-destructive in-situ torque and fastener preload measurement for threaded fasteners such as nuts, bolts, and screws. Conventional NAS and SAE fast ...
SBIRPhase I2020Department of Defense Navy -
Intelligent Resetting Energy Attenuator
Amount: $111,462.40SBIR Phase I Proposal for developing improved mine blast protection bench seats using intelligent energy attenuation system that adjusts response to occupant weight and severity of blast. Injury pre ...
SBIRPhase I2020Department of Defense Army -
Composite Cushion for Seated Aircrew Endurance
Amount: $139,909.00SBIR Phase I proposal for an innovative Composite Seat Cushion (CSC) design concept that improves vibration isolation, static and dynamic comfort, and reduces fatigue. The CSC design concept imbeds ai ...
SBIRPhase I2019Department of Defense Navy