You are here

ANCO ENGINEERS, INC.

Company Information
Address
1965 33RD ST STE A
BOULDER, CO 80301-2551
United States


http://www.ancoengineers.com

Information

UEI: QLLFN77RUQA7

# of Employees: 9


Ownership Information

HUBZone Owned: No

Socially and Economically Disadvantaged: No

Woman Owned: No



Award Charts




Award Listing

  1. Vertical Linear Accelerator for Dynamic Visual-Vestibular Acuity Health Status Evaluation and Desensitization Training

    Amount: $97,576.00

    Military platforms expose personnel to extreme vertical vibrations. These vibrations can induce visual-vestibular disturbance or even permanent injury, resulting in spatial-disorientation-related mis ...

    SBIRPhase I2006Department of Defense Navy
  2. A Fiber-Optic Method for Measuring the Single Scattering Phase

    Amount: $68,738.00

    Measuring the inherent optical properties of the ocean has historically been a very difficult problem. The most widely used in-situ sensor has been the transmissometer, which measures the transmissio ...

    SBIRPhase I1997Department of Defense Navy
  3. QUASI-WELD-FREE AND NANOCRYSTALLINE APPROACHES TO LONG-LIFE BELLOWS SEALS IN CRYOCOOLERS & OTHER RECIPROCATING MACHINES

    Amount: $55,849.00

    Two very different approaches to the sealing reliability probelm of reciprocating machines are to be investigated and compared. In one approach, bellows design improvements are the result of combining ...

    SBIRPhase I1994Department of Defense Missile Defense Agency
  4. MONITOR FOR AIRBORNE LEAD

    Amount: $157,157.00

    N/A

    SBIRPhase II1991Department of Defense Army
  5. PROSTHETIC CONTACT PRESSURE INSTRUMENTATION

    Amount: $30,240.00

    CURRENTLY, PROSTHETIC FITTING IS VERY SUBJECTIVE. LITTLE EXISTS IN THE WAY OF TRANSDUCERS TO AID THE PROSTHETIST. THIS PROJECT WILL DEVELOP A TRANSDUCER, MADE OF A THIN PIEZOELECTRIC FILM, THAT COULD ...

    SBIRPhase I1989Department of Health and Human Services
  6. SIGLE-USE, NON-REVERSIBLE SYRINGE

    Amount: $49,371.00

    IT IS WELL ESTABLISHED THAT THE SHARING OF SYRINGES BETWEEN INFECTED AND NONINFECTED I.V. DRUG USERS HAS BEEN A MAJOR CAUSE IN THE SPREAD OF AIDS. THE DEVELOPMENT OF A SINGLE-USE MECHANISM THAT COULD ...

    SBIRPhase I1989Department of Health and Human Services
  7. INSTRUMENTED TORQUE WRENCH

    Amount: $493,000.00

    QUALITY ASSURANCE (QA) EFFORTS DURING LAUNCH SITE PROCESSINGINVOLVE INSPECTION, SURVEILLANCE, AND IMPLEMENTATION OF STANDARDS TO ASSURE CONSISTENTLY SAFE RESULTS. A NEED EXISTS FOR THE CREATION OF A S ...

    SBIRPhase II1988National Aeronautics and Space Administration
  8. DAMAGE INSPECTION AND VERIFICATION OF TETHERS

    Amount: $49,841.00

    CONSIDERABLE EFFORT HAS BEEN DEVOTED BY NASA AND OTHER ORGANIZATIONS COMMITTED TO THE UTILIZATION OF TETHERS IN SPACE. HOWEVER, MOST TETHER DEPLOYMENT SCENARIOS HAVE A COMMON DENOMINATOR--THEY ARE DEP ...

    SBIRPhase I1988National Aeronautics and Space Administration
  9. TETHER DEPLOYMENT MONITORING SYSTEM

    Amount: $250,000.00

    THE FEASIBILITY AND ECONOMICS OF USING TETHERS FOR STATION-KEEPING OR SLING LAUNCH OF PAYLOADS IS HIGHLY DEPENDENT ON THE RELIABLE CONTROL OF THE TETHER ITSELF IN ANENVIRONMENT. THE PROPOSED TETHER DE ...

    SBIRPhase II1987National Aeronautics and Space Administration
  10. MONITOR FOR AIRBORNE LEAD

    Amount: $49,436.00

    THE OBJECTIVE OF THE PHASE I PROGRAM IS TO ESTABLISH THE FEASIBILITY OF A LOW RESOLUTION X-RAY FLUORESCENCE INSTRUMENT FOR MEASUREMENT OF THE CONCENTRATION OF LEAD IN THE AIR. THE INSTRUMENT MUST BE S ...

    SBIRPhase I1987Department of Defense Army
US Flag An Official Website of the United States Government