You are here

Amber Engineering Inc

Company Information
Address
5756 Thornwood Dr
Goleta, CA 93117
United States



Information

UEI: N/A

# of Employees: N/A


Ownership Information

HUBZone Owned: No

Socially and Economically Disadvantaged: No

Woman Owned: No



Award Charts




Award Listing

  1. LONG-WAVELENGTH INFRARED DETECTION SYSTEM FOR WIND TUNNEL DESIGN & EXPERIMENTAL TECHNIQUES

    Amount: $49,900.00

    N/A

    SBIRPhase I1992National Aeronautics and Space Administration
  2. LOW NOISE INFRARED DETECTOR READOUT ARRAYS FOR 2 KELVIN

    Amount: $49,382.00

    SPACE BASED, LOW-BACKGROUND INFRARED MEASUREMENTS PRESENT STRINGENT PERFORMANCE REQUIREMENTS ON THE INFRARED DETECTOR ARRAYS AND THEIR ASSOCIATED READOUT MULTIPLEXER CIRCUITRY. VERY-LOW-TEMPERATURE CR ...

    SBIRPhase I1991National Aeronautics and Space Administration
  3. VARIABLE SAMPLE RATE FORWARD LOOKING INFRARED (FLIR) CONCEPTURAL DESIGN

    Amount: $499,973.00

    AUTOMATIC TARGET RECOGNIZER (ATR) COMPUTERS ARE CAUSING A REVOLUTION IN THE DESIGN OF FORWARD LOOKING INFRARED (FLIR) SENSORS. HISTORICALLY, FLIRS HAVE UNDER-SAMPLED BECAUSE OF THE SMALL NUMBER OF DET ...

    SBIRPhase II1989Department of Defense Air Force
  4. VARIABLE SAMPLE RATE FORWARD LOOKING INFRARED (FLIR) CONCEPTURAL DESIGN

    Amount: $49,986.00

    N/A

    SBIRPhase I1988Department of Defense Air Force
US Flag An Official Website of the United States Government