You are here

Re/Spec Inc.

Company Information
Address
3824 Jet Dr
Rapid City, SD 57703-4757
United States


http://www.respec.com

Information

UEI: D8UANMMVQDJ8

# of Employees: 230


Ownership Information

HUBZone Owned: No

Socially and Economically Disadvantaged: No

Woman Owned: No



Award Charts




Award Listing

  1. Thermal Salt Sealing System, Phase I

    Amount: $196,925.00

    Long-term disposal of nuclear waste continues to be an issue of national and international importance. A 2012 Blue Ribbon Commission report to the Secretary of Energy states, .“..this nation’s fai ...

    SBIRPhase I2019Department of Energy
  2. Rock Melt Borehole Sealing System

    Amount: $999,790.00

    Deep geological disposal is a promising and widely accepted method for long-term disposal of nuclear waste, and the option of deep borehole disposal is considered an inherently safe method. The feas ...

    SBIRPhase II2015Department of Energy
  3. Rock Melt Borehole Sealing System

    Amount: $149,644.00

    Deep geological disposal is a promising and widely accepted method for long- term disposal of nuclear waste and the option of deep borehole disposal is considered an inherently safe method. The feasib ...

    SBIRPhase I2014Department of Energy
  4. ADVANCED VACUUM INSULATION FOR REFRIGERATED SHIPPING CONTAINERS

    Amount: $50,000.00

    A RESEARCH PROGRAM IS PROPOSED TO DETERMINE THE FEASIBILITY OF USING ADVANCED VACUUM INSULATIONS TO IMPROVE THE PRODUCTIVITY OF REFRIGERATED SHIPPING CONTAINERS WHILE AVOIDING THE ENVIRONMENTAL RISKS ...

    SBIRPhase I1990Department of Transportation
  5. STRUCTURAL ZOOMING

    Amount: $225,049.00

    THIS PROJECT WILL DEVELOP AN INTEGRATED, COMPUTER GRAPHICAL DESIGN TOOL FOR THE NUMERICAL SOLUTION OF BOUNDARY VALUE PROBLEMS OVER DOMAINS CONTAINING GEOMETRIC FEATURES WITH WIDELY VARYING SCALES. MAN ...

    SBIRPhase II1989National Science Foundation
  6. STRESSMETER FOR MEASURING DYNAMIC BRIDGE STRESSES

    Amount: $50,000.00

    A NEED EXISTS FOR A COMPACT, PORTABLE SYSTEM CAPABLE OF MEASURING DYNAMIC STRESSES INDUCED BY HEAVY TRUCKS IN THE STRU- TURAL MEMBERS OF BRIDGES. USE OF STATE-OF-OF THE-ART ELEC- TRONIC CIRCUITRY NOW ...

    SBIRPhase I1988Department of Transportation
  7. STRUCTURAL ZOOMING

    Amount: $50,000.00

    N/A

    SBIRPhase I1988National Science Foundation
  8. DYNAPAR SOFTWARE

    Amount: $49,955.00

    A TWO-PHASE PROJECT WILL PROVIDE DYNAPAR SOFTWARE ON THE DEC VAX11/751 AND ADD INTERACTIVE CAPABILITY TO IT. DURING PHASE I, THE EXISTING DYNAPAR SOFTWARE THAT IS USED BY PERSONNEL AT THE ARMY MATERIA ...

    SBIRPhase I1986Department of Defense Army
US Flag An Official Website of the United States Government