You are here
TECHSOURCE INC
https://www.techsource-inc.com
UEI: DSDEKJ6JRLA7
# of Employees: 250
HUBZone Owned: No
Socially and Economically Disadvantaged: No
Woman Owned: No
Award Charts
Award Listing
-
Alternative Source for Neutron Generation
Amount: $99,960.00This Small Business Innovative Research Phase 1 proposal requests $100,000 support for TechSource to identify and document feasible technology options to replace the White Sands Fast Burst Reactor (FB ...
SBIRPhase I2013Department of Defense Army -
Improvements to Simulation Codes for Electron Cloud Generation in Long-Bunch, High-Intensity Proton Accumulator Rings
Amount: $99,711.00Electron cloud effects, especially electron cloud driven beam instabilities, are critical technical risks for the next generation of high intensity proton rings and for upgrades to existing machines. ...
SBIRPhase I2010Department of Energy -
Design of a Novel Fixed Field Alternating Gradient (FFAG) Accelerator
Amount: $99,546.00The non-scaling Fixed Focus Alternating Gradient (FFAG) Accelerator is of strong interest for DOE facilities and commercial applications as a less expensive, faster cycling, and more-readily-operable ...
SBIRPhase I2006Department of Energy -
Electron Cloud Diagnostic for Quadrupole Magnets
Amount: $650,000.0075153S Electron cloud effects, including electron cloud induced instabilities, are a critical technical risk for the next generation of high intensity, accelerator-based research facilities. In part ...
SBIRPhase II2005Department of Energy -
Advanced Simulator for Neutron Induced Single Event Effects (SEE) in Electronics
Amount: $99,312.00We propose to study the development of a dedicated neutron source for Single Event Effects (SEE)to be collocated and intregrated with an existing neutron source (LENS)at the Indiana University Cyclotr ...
STTRPhase I2005Department of Defense Missile Defense Agency -
Electron Cloud Diagnostic for Quadrupole Magnets
Amount: $99,159.0075153-Electron cloud effects are a critical technical risk for the next generation of high intensity proton and positron rings, to be used in facilities for High Energy Physics research. New diagnost ...
SBIRPhase I2004Department of Energy -
Two-Step Target for Fission Product Radioactive Beam Production
Amount: $750,000.0065480 The production of intense fission product radioactive beams used for nuclear physics research requires special target approaches. One such approach is that of a two-step target, in which a ...
SBIRPhase II2002Department of Energy -
Two-Step Target for Fission Product Radioactive Beam Production
Amount: $0.0065480 The production of intense fission product radioactive beams used for nuclear physics research requires special target approaches. One such approach is that of a two-step target, in which a ...
SBIRPhase I2002Department of Energy -
Development of Textured Buffer Layer On Metal Tapes for Oxide Superconductors
Amount: $99,715.0065480 The production of intense fission product radioactive beams used for nuclear physics research requires special target approaches. One such approach is that of a two-step target, in which a ...
SBIRPhase I2001Department of Energy