You are here

Methods to Remove Coke from Endothermic Heat Exchangers

Award Information
Agency: National Aeronautics and Space Administration
Branch: N/A
Contract: NNC04CA44C
Agency Tracking Number: 034835
Amount: $70,000.00
Phase: Phase I
Program: SBIR
Solicitation Topic Code: A2.03
Solicitation Number: N/A
Timeline
Solicitation Year: 2003
Award Year: 2004
Award Start Date (Proposal Award Date): 2004-01-16
Award End Date (Contract End Date): 2004-07-19
Small Business Information
12345 West 52nd Ave
Wheat Ridge, CO 80033-1916
United States
DUNS: 181947730
HUBZone Owned: No
Woman Owned: No
Socially and Economically Disadvantaged: No
Principal Investigator
 David Wickham
 Principal Investigator
 (303) 940-2350
 wickham@tda.com
Business Contact
 John Wright
Title: Vice President
Phone: (303) 940-2300
Email: jdwright@tda.com
Research Institution
N/A
Abstract

Currently the United States space program is recognized as the world leader in providing access to space. However, in order to maintain this position, it will be necessary to reduce the very high cost of reaching low Earth orbit by using single stage or two stage to orbit vehicles. Some components of these vehicles have exceptionally high heat loads and require additional cooling capacity, which can be accommodated by utilizing the additional fuel heat sink capacity available from endothermic cracking reactions. Unfortunately, cracking reactions lead to coke deposition in the heat exchanger, which can be a potentially serious problem if it is allowed to accumulate. Therefore in this Phase I proposal, TDA Research, Inc. (TDA) will develop methods to remove the coke from the heat exchanger flow path. Previously, several different coke formation mechanisms were though to occur during cracking and the selection of an appropriate method to remove the coke would depend on the mechanism responsible. However, as a result of previous work, we have identified the mechanism primarily responsible for coke deposition with JP-7 and JP-8. Thus, the methods we develop in this SBIR Phase I proposal have a high probability of success.

* Information listed above is at the time of submission. *

US Flag An Official Website of the United States Government