You are here

Aircraft Carrier Catapult Cylinder Slot Gap Measurement

Award Information
Agency: Department of Defense
Branch: Navy
Contract: N68335-04-C-0156
Agency Tracking Number: N041-026-1695
Amount: $69,742.00
Phase: Phase I
Program: SBIR
Solicitation Topic Code: N04-026
Solicitation Number: 2004.1
Timeline
Solicitation Year: 2004
Award Year: 2004
Award Start Date (Proposal Award Date): 2004-03-31
Award End Date (Contract End Date): 2004-09-30
Small Business Information
20 New England Business Center
Andover, MA 01810
United States
DUNS: 073800062
HUBZone Owned: No
Woman Owned: No
Socially and Economically Disadvantaged: No
Principal Investigator
 Michael White
 Principal Scientist
 (978) 689-0003
 white@psicorp.com
Business Contact
 B. Green
Title: Executive Vice President
Phone: (978) 689-0003
Email: green@psicorp.com
Research Institution
N/A
Abstract

Physical Sciences Inc. (PSI) proposes the development of an advanced, self-propelled, aircraft-launch catapult gap measurement instrument to replace aging and obsolete gap measurement devices currently in use by the US Navy Aircraft Carrier fleet. Current equipment is unreliable, bulky, difficult to use and maintain, and prone to measurement errors and frequent failures. PSI has recently developed a "Gap Gear" prototype under an internally funded research and development (IR&D) program that was completed in the fall of 2003. The design incorporates advanced features and capabilities that were identified during discussions with fleet operators and technical experts interviewed aboard the USS Kennedy in the summer of 2003. Through its IR&D program, PSI has developed and demonstrated an innovative design based on proven COTS technologies and has fabricated and tested a prototype catapult gap measurement system that affordably addresses the key system shortcomings observed in the current instrumentation. In the proposed Phase I and subsequent Phase II SBIR programs, PSI shall leverage the results of its IR&D effort, and will fully develop an aircraft launch catapult gap measurement system to meet the catapult gap measurement requirements of the US Navy Catapult preventative maintenance programs.

* Information listed above is at the time of submission. *

US Flag An Official Website of the United States Government