INCLINED BLIND RAISE TUNNEL LINING - INSPECTION AND CONTROL

Award Information
Agency: Department of Defense
Branch: Air Force
Contract: N/A
Agency Tracking Number: 4044
Amount: $60,754.00
Phase: Phase I
Program: SBIR
Solicitation Topic Code: N/A
Solicitation Number: N/A
Timeline
Solicitation Year: N/A
Award Year: 1986
Award Start Date (Proposal Award Date): N/A
Award End Date (Contract End Date): N/A
Small Business Information
Po Box 85154 - 11011 Torreyana
San Diego, CA 92138
United States
DUNS: N/A
HUBZone Owned: No
Woman Owned: No
Socially and Economically Disadvantaged: No
Principal Investigator
 DR JAMES H -Y YU
 (619) 453-6580
Business Contact
Phone: () -
Research Institution
N/A
Abstract

THE BLIND RAISE TUNNEL LINING REQUIRES THAT HIGH SPEED AUTOMATED APPLICATION OF THE LINING MATERIAL BE MADE. AN IMPORTANT ASPECT OF THE TUNNEL LINING PROCESS IS A RELIABLE INSPECTION AND CONTROL SUBSYSTEM THAT WOULD ENSURE THAT THE LINING SATISFY THE CRITERIA ESTABLISHED. IN THIS PROPOSAL, DETAILED DISCUSSIONS OF THE REQUIREMENT FOR SETTING INSPECTION AND CONTROL SUBSYSTEM DESIGN GUIDELINES ARE MADE, PRELIMINARY CONCEPTUAL DESIGN OF AN EXPERT SYSTEM IS PRESENTED, AND THE KEY ISSUES ON THE EVALUATION OF THE SUBSYSTEM IS DESCRIBED.