You are here
Frost Engineering Development
UEI: N/A
# of Employees: 14
HUBZone Owned: No
Socially and Economically Disadvantaged: No
Woman Owned: No
Award Charts
Award Listing
-
AN IMPROVED UPPER TORSO HAULBACK AND INERTIA REEL SYSTEM FOR EJECTION SEATS
Amount: $553,057.00UPPER TORSO HAULBACK MUST BE COMPLETED RAPIDLY TO ASSURE TIMELY EJECTION UNDER ADVERSE CONDITIONS YET THE HAULBACK MOTION SHOULD NOT INJURE THE PILOT. DESIGN OF A HAULBACK SYSTEM SHOULD INCLUDE CONSID ...
SBIRPhase II1991Department of Defense Air Force -
PARACHUTE OPENING SHOCK LOAD LIMITING SYSTEM
Amount: $68,664.00THERE IS A NEED TO SHAPE THE OPENING SHOCK FORCE-TIME PULSE OF A PERSONNEL PARACHUTE IN ORDER TO OBTAIN MAXIMUM DECELERATION WITH A MINIMUM PROBABILITY OF INJURY TO AN EJECTEE. ANALYSIS OF THE BIODYNA ...
SBIRPhase I1990Department of Defense Navy -
AN IMPROVED UPPER TORSO HAULBACK AND INERTIA REEL SYSTEM FOR EJECTION SEATS
Amount: $49,816.00N/A
SBIRPhase I1989Department of Defense Air Force -
FORCE AND PRESSURE/CONTACT INSTRUMENTATION FOR PARACHUTE HARNESSES
Amount: $49,016.00PARACHUTE AND HARNESS DESIGNS NEED TO BE IMPROVED IN ORDER TO PERMIT PARATROOPER DROPS AT HIGHER SPEEDS AND LOW ALTITUDES. LITTLE IS KNOWN ABOUT HOW OPENING SHOCK FORCES ARE TRANSMITTED TO THE PARACHU ...
SBIRPhase I1988Department of Defense Army -
HIGH SPEED PERSONNEL PARACHUTE ENERGY ABSORBER
Amount: $49,075.00A SHORT-STROKE ENERGY ABSORBER CAN BE USED TO REDUCE PARACHUTE SNATCH FORCE AND THE ONSET RATE OF THE OPENING SHOCK. SUCH A DEVICE MUST OPERATE WITH THE DESIRED OPENING SHOCK FORCES AND BE NONELASTIC, ...
SBIRPhase I1987Department of Defense Army