You are here

A PROPOSAL TO EVALUATE EM CONTROL AND DEVELOP DESIGN PHILOSOPHY AND MEASUREMENT PLANS FOR NEW TECHNOLOGY AIRCRAFT DESIGNS

Award Information
Agency: Department of Defense
Branch: Army
Contract: N/A
Agency Tracking Number: 8550
Amount: $300,000.00
Phase: Phase II
Program: SBIR
Solicitation Topic Code: N/A
Solicitation Number: N/A
Timeline
Solicitation Year: N/A
Award Year: 1990
Award Start Date (Proposal Award Date): N/A
Award End Date (Contract End Date): N/A
Small Business Information
Po Box 260263
Denver, CO 80226
United States
DUNS: N/A
HUBZone Owned: No
Woman Owned: No
Socially and Economically Disadvantaged: No
Principal Investigator
 Rodney A Perala
 (303) 980-0070
Business Contact
Phone: () -
Research Institution
N/A
Abstract

A PROGRAM TO EVALUATE EM CONTROL, DEVELOP THE OVERALL DESIGN PHILOSOPHY AND MEANS TO MEANS TO MEASURE THE CONTROL EFFECTIVENESS WILL BE THE GOAL OF THE PROPOSED EFFORT. THE PROGRAM IS OUTLINES IN THIS PROPOSAL. A DATA BASE FOR THE NEW TECHNOLOGY IS TO BE OBTAINED AS THE FIRST SUBTASK; INCLUDING THE DEFINITIONS OF THE EM THREAT WAVEFORMS (EMI, EMP, EW AND ECM, LIGHTNING AND STATIC ELECTRIFICATION), THE COUPLING TO AVIONICS OBTAINED FROM TESTING/SIMULATION AND COMPUTER ANALYSIS AND THE RESPONSE OF CIRCUITS (DAMAGE AND UPSET). DEVELOPMENT OF AN OVERALL HARDENING METHODOLOGY AND THE CONSEQUENT REQUIREMENTS IS THE SECOND SUBTASK FOR PREVENTING DAMAGE AND LIMITING UPSET BASED ON AN ANALYSIS OF THE NEW TECHNOLOGY MATERIALS AND CIRCUITS, AND NEW TACTICS. DEVELOPMENT OF A TESTING AND VERIFICATION PLAN TO MEASURE THE EFFECTIVENESS OF RESULTANT EM HARDENING IS THE THIRD SUBTASK. THIS SUBTASK WILL REQUIRE SPECIFICATION OF EQUIPMENT, PROCEDURES AND CRITERIA FOR BOXES, CABLES, BUSES AND INTERFACES.

* Information listed above is at the time of submission. *

US Flag An Official Website of the United States Government