USA flag logo/image

An Official Website of the United States Government

MICROWAVE POWER OUTPUT COUPLING AND TRANSPORT IN A TWO-BEAM ACCELERATOR

Award Information

Agency:
Department of Energy
Branch:
N/A
Award ID:
6991
Program Year/Program:
1988 / SBIR
Agency Tracking Number:
6991
Solicitation Year:
N/A
Solicitation Topic Code:
N/A
Solicitation Number:
N/A
Small Business Information
DULY Research Inc.
1912 MacArthur Street Rancho Palos Verdes, CA 90275-1111
View profile »
Woman-Owned: No
Minority-Owned: No
HUBZone-Owned: No
 
Phase 2
Fiscal Year: 1988
Title: MICROWAVE POWER OUTPUT COUPLING AND TRANSPORT IN A TWO-BEAM ACCELERATOR
Agency: DOE
Contract: N/A
Award Amount: $497,000.00
 

Abstract:

THIS RESEARCH WILL INVESTIGATE THE FEASIBILITY OF AND TECHNIQUES FOR EXTRACTING MICROWAVE POWER FROM A FREE ELECTRON LASER USING A SEPTUM COUPLER AND FOR TRANSPORTING THE RF WAVE TO FEED A HIGH GRADIENT STRUCTURE IN A TWO-BEAM ACCELERATOR. NUMERICAL SIMULATIONS WILL BE USED TO STUDY THE GEOMETRIC EFFECTS OF THE WAVEGUIDES AND THE EFFECTS OF THERMAL LOAD ON THE MODE CONVERSION AND PHASE STABILITY OF THE TRANSPORTED RF WAVE. METHODS OF CONTROLLING THESE EFFECTS WILL BE PROPOSED TO MAINTAIN THE TE01 MODE AND TO MINIMIZE UNDESIRABLE PHASE SHIFTS IN THE MICROWAVE DURING EXTRACTION AND TRANSPORT. THE METHODOLOGY DEVELOPED IN THIS RESEARCH WILL BE USED AS A BASIC DESIGN TOOL FOR THE COUPLING WAVEGUIDES TO IMPROVE THE EFFICIENCY OF THE TWO-BEAM ACCELERATOR. POSSIBLE APPLICATIONS TO THE RELATIVISTIC KLYSTRON ALSO WILL BE INVESTIGATED.

Principal Investigator:

Dr David U L Yu
2135487123

Business Contact:

Small Business Information at Submission:

Duly Consultants
1912 Macarthur St Rancho Palos Verde, CA 90732

EIN/Tax ID:
DUNS: N/A
Number of Employees: N/A
Woman-Owned: No
Minority-Owned: No
HUBZone-Owned: No